Metro Denver & Front Range (845) 559-9585  ·  Same day response
GroundCare ProExterior Property Services Request a quote
GroundCare ProDivisionsHardscape
Division 03Hardscape

Every surface a person actually walks on.

Concrete is where trip and fall exposure lives, where ADA compliance is decided, and where a property either looks maintained or does not. We pour, set, and repair the walkways, curbs, ramps, and walls that hold the rest of the site together.

Division 03 · Scope6 services
ConcreteFlatwork · Repair
Walkways & rampsADA · Trip hazard
Curb & gutterReplace · Repair
Retaining wallsBuild · Rebuild
PaversInstall · Reset
Site improvementsPads · Bollards · Structures
What we run

Six services, and the only division with a legal standard written into it.

Most hardscape work on a commercial property is not decorative. It is circulation, drainage, and accessibility, and two of those three have rules attached that a property manager gets asked about.

01

Concrete flatwork & repair

Pour · Replace · Section repair

Sidewalks, pads, aprons, and slabs. Full replacement where the panel has failed and section repair where it has not, because replacing a whole run when three panels moved is how concrete budgets disappear.

02

Walkways & ADA ramps

Trip hazard · Slope · Detectable warning

Trip hazard correction, running slope and cross slope, landings, handrails where required, and truncated dome panels. This is the highest exposure item on most properties and it is measurable, which means it is fixable.

03

Curb & gutter

Replacement · Repair · Drainage

Curb is a drainage structure. When it breaks or settles, water leaves the channel it was designed for and goes under the asphalt instead. Repairing curb is usually a pavement decision wearing concrete clothes.

04

Retaining walls

Block · Boulder · Rebuild

New walls, and rebuilds of walls that were built without drainage behind them, which is most of the ones that fail. Segmental block, boulder, and terracing where grade change needs to be managed rather than hidden.

05

Pavers

Install · Reset · Base repair

Entry plazas, courtyards, and walkways in paver, plus resets where the base has settled. Pavers fail from the base up, so a reset that does not address the base is a job you pay for twice.

06

Site improvements

Pads · Bollards · Enclosures · Structures

Dumpster enclosures and pads, bollards, wheel stops, transformer and generator pads, benches, and small structures. The unglamorous list that tenants and inspectors both notice.

When to call

Six things worth a phone call.

Concrete gives a lot of warning before it becomes a claim. These are the warnings.

Signal 01

A lifted panel on a walkway

A vertical offset on a pedestrian route is the most common trip and fall claim on commercial property, and one of the cheapest things on the site to correct.

Signal 02

A ramp nobody has measured

Running slope, cross slope, landing size, and detectable warnings. Ramps built before the current standard usually miss on at least one.

Signal 03

Broken or missing curb

Water stops going where it was designed to go, and the asphalt next to it starts failing within a season or two.

Signal 04

A wall leaning or bulging

Nearly always water behind it with nowhere to go. Walls fail slowly and then all at once, and the second stage is a much larger number.

Signal 05

Settled pavers or a sunken pad

The surface is telling you the base moved. Resetting without fixing the base means doing it again in two years.

Signal 06

A dumpster pad breaking up

Truck loading destroys pads that were poured too thin. It is a small pour and a recurring complaint until it is done right.

How a hardscape job runs

Measured against a standard, not an opinion.

Accessibility and drainage both have numbers attached. That makes hardscape the easiest division to specify precisely and the worst one to leave to interpretation.

STEP 01

Measure

Panel counts, linear footage, offsets, and slopes taken with a level rather than an eye. Accessibility items get recorded as numbers.

STEP 02

Specify

Thickness, reinforcement, base prep, joint layout, and finish. Written down, so what gets poured is what was priced.

STEP 03

Phase

Pedestrian routes stay open. Sections are closed and detoured on a plan, with tenant notice before the saw starts.

STEP 04

Verify

Cure time respected, slopes re checked after the pour, and before and after photos filed against the property record.

Runs alongside

Concrete meets every other division at an edge.

Division 03 · Hardscape

Tell us what your concrete is doing.

We will walk the pedestrian routes, measure the offsets and the slopes, and tell you what is a repair and what is a replacement. Same day response on any request.

Same day response(845) 559-9585Metro Denver & Front Range